Facilities

Our modern facilities including an office and a 2100 m2 (22,604 sq.ft.) workshop are located in Vianen. The central location in the Netherlands assure good accesability to road transport and the canal between Vianen and Rotterdam enables transportation of large structures to the Rotterdam seaport by means of water transport.

Overhead cranes with a total lifting capacity of not less than 40 tons are installed and with a floor capacity of 3 tons per m2 this allows us to build and handle structures up to 25 x 7 x 6 meters (82 x 23 x 19.7 ft.) with weights of up to 300 tons.

The workshop is equipped with:

For final testing the workshop is equipped with a state of the art 200 m2 (2,153 sq.ft.) test facility equipped with:

 

 

 

   

Vwebdesign